GSS Kim
For foundations, basements and other concrete structures where a hot-dip galvanised water-stop plate is required for the connection between the slab and the wall. These can also be custom-made. Contact us for more information
Available products

We will come to your site.
A technical advisor will visit with a GSS sample and show you in 30 minutes how the system works and where you can save time on installation. Free, no-obligation, and coordinated with a site foreman on location

No brochures or technical data sheets, just a real-life demonstration of the system at your location.

Floor thickness, substrate, connections, and specific site conditions are reviewed together.

You will receive a concrete quote within one working day of the visit.

Our consultants each have over ten years of site experience and understand the challenges. You will get answers, not a brochure.
