Concrete poured in 1 year
45.000
m³
Steel
5.000
tonne

The Wings Diegem

Edge formwork with integrated edge protection for Ghelamco

For the prestigious The Wings office project in Diegem, GSS supplied the complete edge formwork with integrated edge protection. One system, one operation, allowing a single worker to continue safely on the next slab immediately.

Over the course of one year, 45,000 m³ of concrete was poured and 5,000,000 kg of steel was processed. A pace that can only be achieved with an edge protection solution that is quick to install, reusable and ensures site safety from the very first metre.

+
Request a demo

We will come to your site.

A technical advisor will visit with a GSS sample and show you in 30 minutes how the system works and where you can save time on installation. Free, no-obligation, and coordinated with a site foreman on location

GSS Profile + Safe demonstrated live

No brochures or technical data sheets, just a real-life demonstration of the system at your location.

Advice tailored to your project

Floor thickness, substrate, connections, and specific site conditions are reviewed together.

Calculated material list and guide price

You will receive a concrete quote within one working day of the visit.

Practical experience

Our consultants each have over ten years of site experience and understand the challenges. You will get answers, not a brochure.